Title : Preparing
for Engineer’s Day on 8th November 2012.
Objectives : 1) To make sure the poster had been
done.
2) To make a preparation for the presentation.
3) To make sure the project is function well to demonstrate to the
assessors.
Procedures: 1) During
the Engineer’s Day, the student must do a demonstration and presentation of the
project at Gemilang Hall.
2) The draft of the
poster had been shown to the supervisor and been printed in A1 size.
Results:
Figure 1: The Smart Chicken Coop poster for the project presentation and demonstration during Engineer's Day.
Conclusion: The project
presentation and demonstration are successfully done and going smoothly. The
assessors and the lecturer that attract with the Smart Chicken Coop were giving
a lot of knowledge and suggestion to improve in future to make it more
marketable. The draft of the report and logbook will be submitted in Week 14 and the hard covered final report will be submitted in Week 17.